Approved Compensatory Mitigation Plan Revision and 9B Operations Permit Modification


Approved 9B operations permit modification for Burnett Oil Co., Inc.'s Nobles Grade 3D Seismic Survey which changed the scope and location of the compensatory wetland mitigation requirement for impacts from the 2017 and 2018 seismic survey per the also approved Compensatory Mitigation Plan Revision.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.