FMP Environmental Assessment


Environmental Assessment for a revised and updated Fire Management Plan for Shenandoah National Park
 
Comment Period: Closed        Oct 17, 2005 - Nov 21, 2005
Document Content:
FMP EA 5-yr Plan Flattop 1 Map   (510.3 KB, PDF file)
FMP EA 5-yr Plan Snead Farm Map   (444.9 KB, PDF file)
FMP EA 5-yr Plan Nicholson Hollow Maps   (794.7 KB, PDF file)
FMP EA 5-yr Plan Fox Hollow Map   (366.9 KB, PDF file)
FMP EA 5-yr Plan Sawmill Run Maps   (532.7 KB, PDF file)
FMP EA 5-yr Plan Sun Valley Maps   (783.0 KB, PDF file)
FMP EA 5-yr Plan Pinnacles Map   (412.0 KB, PDF file)
FMP EA 5-yr Plan Blackrock Map   (644.0 KB, PDF file)
FMP EA 5-yr Plan Rapidan Camp Maps   (951.2 KB, PDF file)
FMP EA Figure 2 Part 1   (992.0 KB, PDF file)
FMP EA Figure 2 Part 3   (990.0 KB, PDF file)
FMP EA 5-yr Plan Loft Mountain Maps   (888.0 KB, PDF file)
FMP EA 5-yr Plan Pumpkin Hill Map   (438.2 KB, PDF file)
FMP EA 10-05 (no maps)   (1.6 MB, Word file)
FMP EA Figure 2 Part 2   (1.0 MB, PDF file)
FMP EA 5-yr Plan Big Meadows WWTP Map   (368.7 KB, PDF file)
FMP EA 5-yr Plan Hogback Towers Map   (367.3 KB, PDF file)
FMP EA 5-yr Plan Big Meadows Map   (316.2 KB, PDF file)
FMP EA Figure 1   (1.4 MB, PDF file)
FMP EA Figure 3 Part 2   (1.1 MB, PDF file)
FMP EA Figure 3 Part 3   (1.0 MB, PDF file)
FMP EA 5-yr Plan Lewis Mountain Map   (390.1 KB, PDF file)
FMP EA 5-yr Plan Doyles River Map   (694.3 KB, PDF file)
FMP EA Figure 3 Part 1   (1.0 MB, PDF file)
FMP EA 5-yr Plan Dickey Ridge Map   (363.0 KB, PDF file)
FMP EA 5-yr Plan Mathews Arm Map   (451.2 KB, PDF file)
FMP EA 5-yr Plan Flattop 2 Map   (536.5 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.