This project will restore hydrologic and ecological functions of a degraded riparian and wetland complex in the Battle Road Unit of Minute Man National Historic Park (MIMA). Drainage through this area has failed during storm events and flooding has become an issue along Sunnyside Road. The first-order basin tributary system at this location drains into Elm Brook, which is an important Massachusetts fish habitat. In addition to restoring watershed functions, this project will create historic wetland conditions providing interpretation opportunities of environmental controls on troop movement during the battle of 19 April 1775.

This project will (1) remove a buried culvert to "daylight" 300-linear feet of stream channel; (2) enhance wetland hydrology by restoring natural overland flow between an existing pond and the daylighted section of stream; (3) replace a pipe culvert under a road with a larger box culvert to enhance wildlife passage; (4) remove abandoned pipes, manholes and other remnants of previous development; and (5) decrease stormwater runoff into the stream through use of a stormwater-infiltration basin.

Surface hydraulics will be reestablished by removing underground culverts, grading surface topography to desired standards, and providing appropriately sized passages for water translation at impoundments. Site assessment and restoration designs have been completed as prescribed by the NPS Water Resources Division (see attached plans). The NPS Northeast Region's Archeology Program specialist has reviewed the site, which will allow the project to be forwarded as a categorical exclusion with respect to removal of historical artifacts.

Contact Information

Chris Davis, Resource Manager
Minute Man NHP
174 Liberty Street
Concord, MA 01742
(978) 318-7831
christopher_davis@nps.gov