Restore Battle Road Wetlands
Minute Man National Historical Park » Restore Battle Road Wetlands » Document List
This project will (1) remove a buried culvert to "daylight" 300-linear feet of stream channel; (2) enhance wetland hydrology by restoring natural overland flow between an existing pond and the daylighted section of stream; (3) replace a pipe culvert under a road with a larger box culvert to enhance wildlife passage; (4) remove abandoned pipes, manholes and other remnants of previous development; and (5) decrease stormwater runoff into the stream through use of a stormwater-infiltration basin.
Surface hydraulics will be reestablished by removing underground culverts, grading surface topography to desired standards, and providing appropriately sized passages for water translation at impoundments. Site assessment and restoration designs have been completed as prescribed by the NPS Water Resources Division (see attached plans). The NPS Northeast Region's Archeology Program specialist has reviewed the site, which will allow the project to be forwarded as a categorical exclusion with respect to removal of historical artifacts.
Contact Information
Chris Davis, Resource ManagerMinute Man NHP
174 Liberty Street
Concord, MA 01742
(978) 318-7831
christopher_davis@nps.gov