Project Links
Install Culverts at Salt Valley Wash Road Crossing
Arches National Park » Install Culverts at Salt Valley Wash Road Crossing » Document List
Proposed Work: The work will include saw cutting 35' of the roadway, installing five 49" x 33" culverts and then backfilling and compacting. This section of the roadway will be compacted dirt up to the elevation of the existing asphalt until sometime in early to late spring, at which point it will be paved. All work will stay within the existing road prism.