Project Links
Resurface Riley Creek Campground Loops and Access Road
Denali National Park and Preserve » Resurface Riley Creek Campground Loops and Access Road » Document List
Project plan as of 2/12/19
- crushing asphalt in the 5-mile pit (2019)
- removing current layer of asphalt and then paving anew 2 campground loops (2020 or 2021) in addition to access road.
-No additional excavation or digging beyond the existing depth and width of the footprint of the loops is planned. Low spots (where water tends to stand) will have additional fill and crowning installed to remedy flooding.