NCPC Section 106 Responses


Pursuant to the requirements of the March 2012 Memorandum of Agreement (MOA), the National Park Service (NPS) and the Dwight D. Eisenhower Memorial Commission (EMC) have prepared a graphic response to the issues raised at the Section 106 Consulting Parties meeting held on December 9, 2014.

At the December meeting, the design team provided a presentation of the design which has received Preliminary Approval from the National Capital Planning Commission (NCPC) in October 2014 and Revised Concept Approval from the Commission of Fine Arts (CFA) in November 2014. Several issues were discussed and a written and graphic response is included in this document.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.