Project Links
Southeast Regional Office » Mississippi Civil Rights Sites Special Resource Study » Document List » Document Contents

Public Scoping Report
Summary of public outreach and comments received on the special resource study during the official scoping period opened on April 16, 2018, and closed on June 8, 2018.
![]() |
Document Content: |
![]() Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems. |