Project Links
Everglades National Park » Cape Sable Plugs Restoration Phase II Environmental Assessment » Document List » Document Contents
Archaeological Survey of the Raulerson Brothers Canal, House Ditch, and Slagle Ditch
As part of the Cape Sable Phase II project, an archaeological survey was conducted in the areas around the Raulerson Brothers Canal, House Ditch, and Slagle Ditch. No archaeological or cultural material was collected during the project, however three historic properties were identified.
Document Content: |
ArchaeologicalSurveyofRaulersonCanalHouseDitchandSlagleDitch.pdf
(29.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |