PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Tennessee Valley Dam Removal and Lower Valley Restoration Project Environmental Assessment


The NPS is proposing to remove a small earthen dam in the Tennessee Valley coastal watershed
to eliminate a safety hazard to visitors at the beach downstream of the dam. NPS also proposes a
set of actions associated with the dam removal to restore habitats in the lower valley, including
reaches both upstream and downstream of the dam. This Environmental Assessment (EA)
evaluates potential impacts of the proposed actions on the environment and analyzes one
Proposed Action Alternative as well as the No Action Alternative.
 
Comment Period: Closed        Oct 18, 2022 - Nov 17, 2022
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.