Determination of Non-Impairment


The National Park Service has determined that implementation of the Selected Alternative will not constitute an impairment of the resources or values on NPS lands. This conclusion is based on consideration of the purpose and significance of Golden Gate National Recreation Area (GGNRA), a thorough analysis of the environmental impacts described in the Redwood Creek Trail Realignment and Dias Ridge Trail Extension Project Environmental Assessment, comments provided by the consulting agencies and the general public, and the professional judgement of the decision maker guided by the direction of the 2006 NPS Management Policies.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.