Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.
An edited landscape photo showing a considered portion of the trail alignment for the Milagra Battery Trail, with rock walls to provide a sustainable grade .

Milagra Battery Trail and Signs DRAFT CEQA/NEPA Environmental Compliance Categorical Exemption/Categorical Exclusion


This draft document describes the proposed project at Lower Milagra Ridge, and includes an environmental impact assessment regarding reconstruction of the Milagra Battery Trail, which would consolidate existing social trails into one established route. The background and project description are provided to support NEPA and CEQA compliance and to provide a determination that the project meets the conditions of a Categorical Exemption and a Categorical Exclusion. The purpose of the project is to construct a sustainable multi-use trail that connects the Connemara neighborhood in Pacifica to Milagra Ridge. The project would complete a segment of the Bay Area Ridge Trail and protect endangered species habitat.

This document includes:
- Milagra Battery Trail and Signs Project Description
- Attachment A - NEPA Categorical Exclusion Memorandum
- Attachment B - NHPA Approval and 5X Project Review
- Attachment C - CEQA Categorical Exemption Memorandum
 
Comment Period: Closed        Nov 25, 2015 - Dec 24, 2015
Document Content:
Milagra Battery_CE_final_draft.pdfMilagra Battery_CE_final_draft.pdf   (4.8 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.