Point Bonita Bridge Replacement Project


The project proposes to replace the existing pedestrian cable suspension bridge utilizing the existing concrete tower foundations and cable anchor blocks with a visually almost identical structure. The new structure will use the same type of materials as the existing structure but it will be upgraded to be in compliance with existing codes.
 
Comment Period: Closed        Apr 22, 2011 - May 27, 2011
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.