Finding of No Significant Impact - Rehabilitation of Arlington Memorial Bridge


The National Park Service (NPS) has completed the planning process for the rehabilitation of the Arlington Memorial Bridge. The NPS will next design and implement the rehabilitation of this important element of the regional transportation network and the monumental core of Washington, D.C.

After carefully reviewing a number of rehabilitation options, the NPS has selected Alternative 1B, a comprehensive plan to preserve the character and defining features of the bridge by replacing and refurbishing the original bridge components. The plan includes the repair of the concrete arches and stone facades on the 10 approach spans, the replacement of the bascule span's steel superstructure, the reconstruction of the bridge deck and sidewalks and the resurfacing of all travel lanes.

NPS National Capital Region Director Bob Vogel today formalized the selection of the plan by signing a Finding of No Significant Impact at the conclusion of an environmental analysis and interagency review that determined that the project will have no significant adverse impacts on the historic nature of the iconic bridge. The signed Finding of No Significant Impact statement may be viewed here.
 
Document Content:
02062017 executed AMB FONSI.pdf   (10.7 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.