Wawona Wastewater Treatment System Rehabilitation - Public Scoping Materials


This project has three components as described below. The first component upgrades the plant's infrastructure including requirements associated with the issuance of a Time Schedule Order (TSO) by the California Regional Water Quality Control Board in 2013 that addresses the sewage treatment plant's inability to remove dichlorobromomethane (a potential carcinogen). The NPS has until July 2018 to comply with the requirements of the TSO. The second component was identified as a Category 2 action under the MRP which calls for construction of a pump station and utility corridor connecting the Wawona Campground to the Wawona Wastewater Treatment Plant. The third component replaces a single-stall vault toilet with a double-stall flush toilet facility at the South Fork Picnic Area (pending funding availability).
 
Comment Period: Closed        Apr 13, 2017 - May 17, 2017
Document Content:
WWTP Map for Public Scoping.pdf   (2.2 MB, PDF file)
2017_03_24 Fact Sheet.docx   (428.6 KB, .docx file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.