Public Scoping Presentation


Muir Woods Road Improvement Project public scoping presentation that was presented on November 9, 2016. Includes the PowerPoint presentation and posters that were presented.
 
Comment Period: Closed        Dec 14, 2016 - Jan 31, 2017
Document Content:
MuirWoods PubMtg Boards FINAL.pdf   (6.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.