Project Links
Mount Rainier National Park » 2018 Paradise Cellular Environmental Assessment and FONSI » Document List » Document Contents
Paradise Cellular Environmental Assessment
The National Park Service (NPS) prepared an Environmental Assessment that considered the issuance of right-of-way permits to Verizon Wireless, T-Mobile and AT&T that would allow co-location of a limited range Wireless Communications Facility (WCF) in the Paradise area, Mount Rainier National Park, Pierce County, Washington. The NPS is required by the Telecommunications Act of 1996 to consider all applications for the installation of wireless communication facilities on NPS lands.
The NPS released a decision to grant permits as detailed in the FONSI. The news release and FONSI can be found in the document list. See also: https://parkplanning.nps.gov/ParadiseCellular
Comment Period:
Closed
Jun 5, 2017 - Jul 19, 2017
|
![]() |
Document Content: |
Paradise Cellular Environmental Assessment for Public Release_2017-06-05.pdf
(2.8 MB, PDF file)
Mount Rainier NP Telecomm News Release_2017-06-05.pdf
(335.6 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |