PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Cape Sable II Plug Restoration Topography and Bathymetry Report


This report documents the topographic and bathymetric surveys performed as part of the Cape Sable Phase II Plugs Restoration Project. Limited bathymetric and topographic surveys were conducted at the proposed barge routes in shallow areas primarily to determine whether dredging will be required and if the tentative plug locations are in optimal areas.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.