Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Final Study Documents


The final Rim of the Valley Corridor Special Resource Study was transmitted to Congress on February 16, 2016. The final study report is comprised of the following three documents:

1. Finding of No Significant Impact (including selected alternative)
2. Errata/Technical Corrections to the Rim of the Valley Corridor Draft Special Resource Study and Environmental Assessment
3. Draft Rim of the Valley Corridor Draft Special Resource Study and Environmental Assessment (2016)

The NPS has also prepared a summary newsletter of the final recommendations and selected alternative.
 
Document Content:
Final Summary NewlsetterFinal Summary Newlsetter   (1.3 MB, PDF file)
Selected Alternative Map (8.5x11)Selected Alternative Map (8.5x11)   (784.2 KB, PDF file)
Selected Alternative Map (42x30)Selected Alternative Map (42x30)   (11.5 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.