Project Links
Everglades National Park » Tamiami Trail Modifications Limited Reevaluation Report / Environmental Assessment » Document List » Document Contents
NPS FONSI, Tamiami Trail Modifications LRR / EA
This is the NPS NEPA decision document for the Tamiami Trail Modifications LRR / EA signed on July 22, 2008.
Document Content: |
NPS_LRR_Final Signed FONSI Package .PDF
(2.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |