Project Links
Golden Gate National Recreation Area » Access Reservation System, Muir Woods » Document List » Document Contents
Muir Woods Reservation System EA
**UPDATE**
On December 23, 2015, Acting Pacific West Regional Director Martha Lee approved the Finding of No Significant Impact (FONSI). The FONSI, Determination of No Impairment (DNI) and Errata are available under the "Documents List" tab.
- -
The Muir Woods National Monument Reservation System Environmental Assessment is now available for comment. The proposed reservation system was informed by goals outlined in the General Management Plan, the Redwood Creek Watershed Vision for the Future, transportation experts, and feedback from stakeholders and members of the public gathered over the last twenty months.
The proposed reservation system would enable the park to proactively manage parking and visitor flow to protect the health of the Redwood Creek Watershed, and allow for greater enjoyment of this treasured park site by effectively addressing overcrowding, traffic congestion, and parking issues.
This project is part of a larger effort to carefully steward the entire Redwood Creek watershed which includes trail improvements, plant restoration, new signage, and much more.
Comment Period:
Closed
Oct 23, 2015 - Nov 22, 2015
|
Document Content: |
10.21.15 Muir Woods Reservation System Final EA SMALL.pdf
(2.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |