Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

*Final Cesar Chavez Special Resource Study


The final Cesar Chavez Special Resource Study was transmitted to Congress on October 24, 2013. The final study report includes the final NPS recommendations and the Finding of No Significant Impact.
 
Document Content:
Abstract and Table of ContentsAbstract and Table of Contents   (78.9 KB, PDF file)
Executive SummaryExecutive Summary   (141.9 KB, PDF file)
Chapter 1:IntroductionChapter 1:Introduction   (127.0 KB, PDF file)
Chapter 3: Resource SignificanceChapter 3: Resource Significance   (4.5 MB, PDF file)
Chapter 4: SuitabilityChapter 4: Suitability   (181.0 KB, PDF file)
Chapter 5: FeasibilityChapter 5: Feasibility   (215.6 KB, PDF file)
Chapter 6: AlternativesChapter 6: Alternatives   (405.1 KB, PDF file)
Chapter 7: Environmental ConsequencesChapter 7: Environmental Consequences   (433.1 KB, PDF file)
Appendices A-GAppendices A-G   (558.9 KB, PDF file)
Front and Back CoversFront and Back Covers   (3.4 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.