Preliminary Findings and Alternative Concepts - Summary of Public Comments (August 2013)


The purpose of this document is to provide information about the public comments received on the preliminary findings and alternative concepts for the Rim of the Valley Corridor Special Resource Study from October 2012 through January 2013. This document does not include responses to the comments. The National park Service study team will consider these comments in preparing the draft study report.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.