PEPC and Parkplanning will have an outage from 5 PM to 10 PM MT on July 19th due to network maintenance. Please plan and save your work accordingly.

Notice of Preparation/Notice of Intent - February 28, 2013


The project location, description, and a summary of the probable environmental effects of the project are in this document. These effects and all issue areas required by CEQA and NEPA will be evaluated in the Draft EIR/EIS. The Draft EIR/EIS is anticipated to be published in late 2013.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.