Sandy Creek Bridge Reconstruction Environmental Assessment


This EA analyzes alternatives to replace the Sandy Creek Bridge on the east side of Pinnacles National Monument and the potential impacts on the environment.
 
Comment Period: Closed        Jun 6, 2011 - Jul 10, 2011
Document Content:
Sandy Creek Bridge Reconstruction   (3.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.