Project Links
Pacific West Regional Office » Rim of the Valley Corridor Special Resource Study » Document List » Document Contents
Rim of the Valley Corridor SRS Newsletter #1 July 2010 (Boletin Informativo #1 Julio 2010)
This newsletter describes the Public Scoping Process, how to get involved, and how to make written comments. Dates and locations for a series of public workshops in September and October, 2010 is also included. Check our website for updates or sign-up for e-mail alerts at www.nps.gov/pwro/rimofthevalley.
Comment Period:
Closed
Jun 3, 2010 - Oct 29, 2010
|
Document Content: |
Boletin Informativo 1
(961.5 KB, PDF file)
Newsletter One July 2010.pdf
(969.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |