PEPC and Parkplanning will be offline Weds. May 8th starting at 7 AM MT for scheduled maintenance. Expected downtime is up to three hours.

Final National Historic Trail Feasibility Study Amendment and EA for Trail of Tears National Historic Trail Additional Routes


Final feasibility study/EA for Trail of Tears additional routes and maps
 
Document Content:
Context Map   (196.6 KB, PDF file)
Section Map 1   (457.4 KB, PDF file)
Section Map 2   (316.0 KB, PDF file)
Section Map 3   (334.3 KB, PDF file)
Section Map 4   (226.4 KB, PDF file)
Section Map 5   (275.6 KB, PDF file)
Section Map 6   (228.1 KB, PDF file)
Section Map 7   (319.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.