Project Links
Yosemite National Park » Glacier Point Road Bridalveil Creek Bridge Rail Replacement » Document List » Document Contents
Approved CE Package
Bridge rails have deteriorated; one rail has broken and is in danger of sloughing into Bridalveil Creek. Corporate memory suggests that rails were last replaced twenty-something years ago. Log pedestals will also be replaced. There are no apparent fasteners, plan is to simply lift off deteriorated rails and pedestals, and replace in-kind with native materials (already staged on-site). LCS #56024/HAER CA-103.
Document Content: |
Approved CE Package
(2.6 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |