Project Links
Pipestone National Monument » Pedestrian Access Plan » Document List » Document Contents
Finding of No Significant Impact (FONSI) & Determination of Non-Impairment
The National Park Service (NPS) has issued the Finding of No Significant Impact (FONSI) for the "Pedestrian Access Plan" Environmental Assessment (EA) for Pipestone National Monument.
The NPS selected Alternative B to Construct Southside Pedestrian Access Trail. The proposed action was selected after careful analysis of potential impacts to resources and the visitor experience, and in consultation with affiliated Tribes, the U.S. Fish and Wildlife Service (USFWS), the Minnesota Department of Natural Resources, Minnesota State Historic Preservation Office (SHPO).
Comment Period:
Closed
Jun 26, 2023 - Jul 26, 2023
|
Document Content: |
2023_PIPE_PedAccessEA_FONSI DONI_Final.pdf
(461.8 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |