Project Links
Denali National Park and Preserve » Nenana River Trails » Document List » Document Contents
Nenana River Trails EA
This Environmental Assessment analyzes several alternatives for the development of trails in the Nenana River corridor in Denali National Park.
Comment Period:
Closed
Mar 1, 2023 - Mar 30, 2023
|
Document Content: |
Nenana River Trails EA - March 2023.pdf
(2.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |