Project Links
Glacier Bay National Park and Preserve » Marine Management Plan Environmental Assessment including Updates to Vessel Quotas and Operating Requirements » Document List » Document Contents
Draft Marine Management Plan and Environmental Assessment
The National Park Service (NPS) is pleased to release a draft Marine Management Plan and Environmental Assessment for a 30-day public review.
Between November 30 and December 30, 2022 your input is encouraged during a 30-day public review period. You are encouraged to submit comments through this PEPC website. Comments will also be accepted during the public hearings and by US mail: Glacier Bay National Park and Preserve, Attn. Marine Management Plan, PO Box 140, Gustavus, AK 99826.
To review draft Marine Management Plan and Environmental Assessment, select the document link under the 'Open for Comment' tab on the left-hand side of this page.
The final plan is scheduled to be completed in the winter of 2023 and will be posted on this site once available.
Comment Period:
Closed
Nov 30, 2022 - Dec 30, 2022
|
![]() |
Document Content: |
GLBA_publiccommentEA_FAQs.pdf
(211.2 KB, PDF file)
GLBA_Marine Management Plan and EA_11302022.pdf
(13.1 MB, PDF file)
GLBA_Public Hearings Presentation.pdf
(8.0 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |