Project Links
Pipestone National Monument » Pedestrian Access Plan » Document List » Document Contents
Pedestrian Access Trail Options
Map shows 3 trail route options.
Option 1 runs along the north side of Reservation Ave.
Option 2 runs along the south side of Reservation Ave, with a small spur connecting to the proposed city trail
Option 3 also runs along the south side of Reservation Ave until the driveway to the picnic area where is diverts down the driveway, into the picnic area and through prairie lands, where it could connect to the cities proposed trail.
Comment Period:
Closed
Oct 5, 2022 - Nov 10, 2022
|
Document Content: |
Trail Options for Public Comment_508.pdf
(378.3 KB, PDF file)
Trail Public Meeting Presentation_508.pdf
(1.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |