Project Links
Olympic National Park » Finley Creek, Olympic National Park » Document List » Document Contents
Maintaining Finley Creek Road Access Through Continued Removal of Gravel
The EA analyzes the effects of continued bulldozing of gravel in the intermittent Finley Creek channel to protect the Quinault North Shore Road’s Finley Creek bridge and to maintain access to the Quinault Valley, both for National Park Service (NPS) visitors as well as area residents and property owners. The EA evaluates the removal of a portion of the stream bed’s gravel for use in park projects in the Quinault area. The EA also analyzes a no action alternative.
Comment Period:
Closed
Jul 19, 2005 - Aug 19, 2005
|
Document Content: |
Chapter 1
(763.0 KB, Word file)
Chapter 3
(45.5 KB, Word file)
Chapters 5 and 6
(58.5 KB, Word file)
Map 1b
(1.6 MB, Word file)
Table of Contents
(40.0 KB, Word file)
Appendices
(86.0 KB, Word file)
Chapter 2
(1.3 MB, Word file)
Chapter 4
(213.5 KB, Word file)
Maps 1 and 1a
(1.7 MB, Word file)
EA Cover
(25.0 KB, Word file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |