The existing bridge would continue to be available for NPS and landowner access during construction. The construction area would be closed to public access for the duration of construction. Traffic delays would be minimized as much as possible, with 30 to 60-minute closures expected. Full closures, possibly for 2-3 days at a time, would be necessary at times for safety (such as during crane operations).
Parking for the Upper McDonald Creek Trailhead west of the bridge would also be formalized under this proposal, likely with 10 delineated head-in parking spaces.