Government Shutdown Alert National parks remain as accessible as possible during the federal government shutdown. However, some services may be limited or unavailable. For more information, please visit: doi.gov/shutdown

Replace Failing Shoreside Dock at Visitor Center

Pearl Harbor National Memorial » Replace Failing Shoreside Dock at Visitor Center

REPLACEMENT OF THE SHORESIDE FLOATING DOCK & ANCHORING SYSTEM AT PEARL HARBOR NATIONAL MEMORIAL VISITOR CENTER

The National Park Service (NPS) proposes to replace the shoreside floating dock and anchoring system at the Pearl Harbor National Memorial Visitor Center.

The NPS is evaluating options to replace the existing shoreside floating dock and anchoring system. The new dock will provide the capability to accommodate mooring of park owned boats on both ends of the docks. The shoreside dock anchoring system will consist of a new anchoring system and new or rehabilitated concrete abutments necessary to support new strut anchoring and new gangplanks.

Contact Information

Glenn Fickbohm, Facility Manager
(808) 422-3399