Parkwide Wayside Exhibit Replacement and Installation

Yosemite National Park » Parkwide Wayside Exhibit Replacement and Installation » Document List

This project updates 24 interpretive wayside exhibits throughout the park, the majority being on the Tioga Road. Most of these waysides are in-kind replacement. However, three new exhibits will be placed at two new sites. One will be placed at the Lukens Lake trailhead in conjunction with the Tioga Trailheads project. Two will be replaced at new sites in the Tioga Pass overflow parking lot.
One other existing wayside will be addressed during installation. This exhibit was relocated to Half Dome View due to vandalism at its previous site. It was removed from the Half Dome view during the installation of the new exhibit and will be relocated back to its original location at Foresta Trailhead.
New sign installation includes post holes measuring one foot in diameter and three feet deep.