Parkplanning and PEPC will be offline for Data Center maintenance from 4 PM MT on Fri., Apr. 19th to as late as 3:00 PM MT on Mon., Apr. 22nd.

Vogelsang Water Tank, Septic Tank, and Dosing Siphon Repair and Replacement

Yosemite National Park » Vogelsang Water Tank, Septic Tank, and Dosing Siphon Repair and Replacement » Document List

This routine maintenance project consists of replacing the existing water tank and existing dosing siphon and completing repairs to the existing dosing and septic tanks at the Vogelsang High Sierra Camp (VHSC). The existing 2,880-gallon concrete water storage tank at VHSC is degraded and does not provide for proper disinfection of potable water and is therefore not in conformance with the Safe Drinking Water Act, National Park Service (NPS) regulations, nor established State of California Department of Health regulations. The existing concrete dosing siphon leaks and does not function properly. The existing 6,900-gallon septic tank leaks.

Please click on the 'Document List' and open the 'Approved CE Package' for the full document description.