Olmsted Point Interpretive Displays Installation

Yosemite National Park » Olmsted Point Interpretive Displays Installation » Document List

The proposed project includes installation of 5 new Interpretive Displays at Olmsted Point as part of the Olmsted Point Rehabilitation Project. The proposed displays will be placed within the existing disturbance area required for the rehabilitation of Olmsted Point. (Ref. CE-2005-030--Olmsted Point Rehabilitation) There will be no additional excavation required to install the proposed interpretive displays.