EIS NC 12 Replacement of Herbert C. Bonner Bridge

Cape Hatteras National Seashore » EIS NC 12 Replacement of Herbert C. Bonner Bridge » Document List

The NPS formally adopts the 2008 FEIS and 2010 EA to document the decision to issue a special use permit and grant a federal highway easement deed to NCDOT for the construction of this project. The NPS served as a cooperating agency during the development of the FEIS and EA and has determined, after an independent review, that the comments and suggestions submitted to the lead agencies during the NEPA process have been satisfied, and that the EA (http://www.obtf.org/documents/EA/BonnerBridgeEA_05072010.pdf) and FEIS (http://www.obtf.org/documents/FEIS/02_FEISSummaryCommitmentsTOC.pdf ) comply with all NEPA-related requirements applicable to the NPS. Therefore, the NPS adopts the EA and FEIS without recirculating them (40 CFR 1506.3, 43 CFR 46.320).