El Portal Pinchot Remodel

Yosemite National Park » El Portal Pinchot Remodel » Document List

This project will demolish a garage and second story guest room on the land assignment at 9734 Rocky Road in El Portal and rebuild a similar structure on the existing footprint. The new structure will include a bedroom, kitchen/living room, and bath on a new foundation. This demolition will require the demolition of an original rock foundation to install the new concrete foundation. Excavation activities will take place to level and square the current foundation space. The new construction will also include an above ground front deck and small rear deck. Foundation dimensions will be 15 ft. by 30 ft. The sewer connection for the apartment will be stubbed in to the existing sewer for the main house.

The proposed new construction will keep the residence as a single family residential structure/dwelling and will retain the massing, scale and character found in other single family residential structures within the El Portal neighborhood.

Once construction begins the project is estimated to be completed within 9 to 12 months.