Create trench from Morse House (HS-09) to equipment storage area for electrical line

Lincoln Home National Historic Site » Create trench from Morse House (HS-09) to equipment storage area for electrical line » Document List

A narrow trench will be dug from the South wall of the Morse House (HS-09) approximately 30' to the equipment storage "boneyard" area to install an electrical outlet inside the fenced, locked area to allow charging of the hydraulic lifts. The trench will dug by backhoe, conduit and electrical line installed, and the dirt reused to fill in the trench. The trench will be reseeded with new grass seed.

Contact Information

Jason Taylor, 217-391-3235