The general scope of work is to install four groundwater monitoring wells using a small drill rig. Wells will be numbered BPMW-5, 6, 7, and 8 and will be installed at a depth not to exceed 15 feet having a 2 inch casing placed underground including an 8" well cap on the ground surface.
To minimize impacts to the ground surface during the installation of monitoring wells numbered 6, 7, and 8, DNC will lay down plywood panels as a path of travel for the drill rig to access the off road areas.
DNC has hired an environmental consulting firm to oversee the well installation including meeting all county, state and federal regulations.