Remove damaged walls and roof structure from top of block wall due to tree damage. Replace all framing and roof structure to match other comfort stations in campground. Re-roof shall be hot mop. Windows to be replaced in kind hopper type with obscured glass. Repaint interior of restroom and exterior touch-up as needed. Colors to match existing colors. Repair plumbing alley door to open and close properly. Change the men's side head rail for partitions and stall doors. NPS to make all lock repairs. NPS to make all plumbing repairs if needed. There is no electrical in the building. All materials and debris to be removed from Yosemite National Park.