Project Links
Everglades National Park » Everglades National Park GMP/East Everglades Wilderness Study » Document List » Document Contents
EVER GMP - Newsletter 5 - March 2009
This newsletter presents four revised preliminary management alternatives for the marine waters of Everglades National Park (the elements of the alternatives published in the May 2007 newsletter for all other areas of the park remain valid and will be used in upcoming GMP steps). The revised marine alternatives have been crafted considering the comments and ideas we received and updated scientific information concerning the park's marine waters.
Comment Period:
Closed
Feb 26, 2009 - May 15, 2009
|
Document Content: |
EVER GMP/Wilderness Study, Newsletter 5, Part 2 (Alternative 1)
(4.6 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, Part 3 (Alternative 2)
(3.5 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, Part 4 (Alternative 3)
(4.3 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, entire document
(20.9 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, Part 5 (Alternative 4)
(4.3 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, Part 6
(1.9 MB, PDF file)
EVER GMP/Wilderness Study, Newsletter 5, Part 1
(4.3 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |