PEPC and Parkplanning will be offline Weds. December 11th starting at 7:00 AM MT for scheduled maintenance. Expected downtime is up to four hours.

Conduct Additional Site Assessments on Moose, Taybo, & Bueno Mining Claims


The scope of this project is to excavate two of the original 14 sites at the Moose, Bueno, and Taybo mining claims in Kantishna and collect confirmation samples in a zone of contamination where Diesel Range Organic concentrations exceeded ADEC thresholds in the past. Excavation work will be performed with hand tools and/or auger and the samples are to be processed and tested by a contractor.
 
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.