Project Links
National Trails System » Feasibility Study Revision for Additional Routes to the Oregon, California, Mormon Pioneer, and Pony Express National Historic Trails » Document List » Document Contents
Notice of the termination of the EA process for the Four Trails Study
The purpose of this document is to inform the public that the NPS has terminated the environmental assessement process for the Four Trails Feasibility and Suitability Revision Study. The NPS has determined that a categorical exclusion is appropriate for the study.
Document Content: |
4TRLs Press Release EA to CE FINAL 20170922.pdf
(618.7 KB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems. |