This is a photograph of the Shark Valley Tram Road. In the foreground, a flooded Tram Road is flanked by marshes. The Shark Valley Tower with brilliant red and orange sunset colors can be seen in the background.

Shark Valley Site Plan Environmental Assessment, February 2022


Environmental Assessment examines the effects of providing overflow parking, installing shade structures along the Shark Valley Tram Road, and reducing flooding at the Entrance Road, Tram Road and the Administration Complex by raising the respective finished roadway and finished floor elevations.
 
Comment Period: Closed        Feb 9, 2022 - Mar 11, 2022
Document Content:
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems.