Old Tamiami Trail Modifications Environmental Assessment


Environmental Assessment examines the effects of modifying an original 5.7 mile segment of Old Tamiami Trail located along the northern boundary of Everglades National Park, as proposed in the Central Everglades Planning Project (CEPP).

High resolution and compressed versions of the EA are attached below.
 
Comment Period: Closed        Dec 5, 2017 - Jan 13, 2018
Document Content:
EVERTamiamiTrail_Public Review EA.pdf   (45.9 MB, PDF file)
Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of from Adobe Systems.