Construct Accessible Hunt Blind and Wildlife Viewing Platform EA
This is the environmental assessment documentation on the construction of a new accessible hunt blind and wildlife viewing boardwalk and platform. This project would include a concrete parking lot, interpretive signage, an approximate 260 foot long elevated boardwalk to a partially covered platform over an open pond within the federally authorized hunt area on Bodie Island.
This document also includes a Floodplain Statement of Findings for constructing a facility within a 100-year floodplain.
Comment Period:
Closed
Feb 4, 2019 - Feb 20, 2019
|
Document Content: |
Construct_AccessibleHuntBlind_EA_Dec2018_508.pdf
(9.9 MB, PDF file)