Project Links
Mount Rainier National Park » 2018 Paradise Cellular Environmental Assessment and FONSI » Document List » Document Contents
Background Information
This file contains the initial applications, subsequent proposed designs, photo simulations and coverage maps of those proposals. The initial proposal included installation of a "cupola" that would house equipment and antennas, and a subsequent proposal dropped the cupola but added panels on the north wall. The potential for towers was also investigated. All three proposals were dismissed by the NPS.
![]() |
Document Content: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Disclaimer: Links within the above document(s) were valid as of the date published.
Note: Some of the files may be in PDF format and can be viewed using the Adobe Acrobat Reader software. You may download a free copy of Acrobat Reader from Adobe Systems. |